At a glance: the Electronic Building Identity (ΗΤΚ) is the digital file that records a property's legal status. For «Renovation of a Home 2026» it is required and is issued by an engineer. It is not submitted with the application: it goes in together with the first ΠΕΑ within 3 months of your application being found eligible. Its cost is 100% covered up to €2,500, on top of the €36,000 ceiling.
What the Electronic Building Identity is
The ΗΤΚ is the electronic file gathering a building's (or individual property's) data and drawings: permit records, floor plans, any unauthorised-works settlements, and certificates. It was established by Law 4495/2017 and is kept in the Technical Chamber's (ΤΕΕ) information system. Law 4495/2017 — Electronic Building Identity
Why the programme needs it
For the «Renovation of a Home» application to be approved, the property must be planning-compliant, and that compliance is captured in the ΗΤΚ. You submit it together with the first ΠΕΑ within 3 months of your application being found eligible, before the inclusion decision; if it is late, the application is rejected automatically. The platform then checks it automatically against the electricity supply number, floor area, age and permit. You can start early: its cost counts as eligible from 2 June 2026. How the 3 months are counted, and what you upload at each stage, is in ΠΕΑ and ΗΤΚ: after the application, not before.
Request an engineerThe process step by step
- Appoint an engineer — you authorise an engineer to handle the identity.
- Site survey & document gathering — permits, drawings, titles, any settlements.
- Legality check & square-metre matching — comparing the real state against official records; spotting unauthorised works.
- Registration & issue — the engineer submits the data to the ΤΕΕ system and the Completeness Certificate is issued.
Cost and timing
Cost depends on the property type and condition. Indicatively, for an apartment with no pending issues it is around €150–400, and higher for a detached house or a property needing settlements. Issuing usually takes a few days to two weeks, depending on drawing availability. These figures are indicative — request a quote for your case. The programme reimburses the ΗΤΚ up to €175 + €3.50/m² (maximum €645).
Relationship to the legality check
The ΗΤΚ is directly tied to the legality check and the matching of square metres. If unauthorised works or discrepancies surface, the regularisation must be filed before you apply for financing, be final when you submit the ΗΤΚ and be completed before the final payment — otherwise the property is not eligible. In practice the identity is also a first "health check" of your file.
Covered by the programme
The ΗΤΚ is one of the auxiliary costs (alongside the engineer's fee, the EPCs and the permits) covered 100% up to €2,500, on top of the €36,000 subsidy ceiling. ΦΕΚ Β' 3058/2026, Article 6 §5
Frequently asked questions
Is the Electronic Building Identity mandatory for the subsidy?
Yes. The property must be planning-compliant and that compliance is recorded in the ΗΤΚ. You submit it together with the first ΠΕΑ within 3 months of your application being found eligible; if it is late, the application is rejected automatically.
How much does the ΗΤΚ cost?
Indicatively €150–400 for an apartment with no pending issues; more for a detached house or a property needing settlements. The programme reimburses it up to €175 + €3.50/m² (maximum €645), within the €2,500 auxiliary-cost limit.
Who issues the Electronic Building Identity?
Only an authorised engineer, who registers the data in the ΤΕΕ system and issues the Completeness Certificate.
What if there are unauthorised works?
The regularisation must be filed before you apply and be final by the time you submit the ΗΤΚ. The engineer spots the discrepancies during square-metre matching and proposes the settlement.
An engineer for the Electronic Building Identity
Tell us what you need for the ΗΤΚ. Your request goes to partner engineers in your area.
A whole number, from 10 to 1000.
Or first calculate your subsidy